Tendering and pricing an extension builder in Ireland

Clean Irish extension tenders start with scaled tender drawings, a structural engineer's steel/foundation spec and a clear shell-vs-turnkey schedule. Builders quote at 13.5% construction VAT, link draws to physical site milestones, and hold a 2.5% to 5% defects retention through snagging.

How to get like-for-like written builder tenders, structure fair milestone stage payments and keep extras under control.

Free, no obligation. One local builder prices it, not five.

  • 13.5% VATresidential construction services rate
  • 5–7 drawstypical milestone stage payments
  • 2.5%–5%standard defects snag retention
  • 14 daystypical variation sign-off rule
Printed residential floor plan drawings on a timber table with a tape measure and pen

What belongs in a builder-ready tender pack

Asking three builders to price off a hand sketch guarantees three completely different assumptions on insulation, glazing, RSJs and kitchen allowances. Handing a contractor a concise tender pack lets them price tight, fair figures without padding for guesswork.

  1. Scaled working drawings (1:50 plans and sections). Existing and proposed floor plans, roof heights, window sizes, door swing directions and drainage layout.
  2. Structural steel and foundation schedule. Engineer-sized RSJ sections, padstone grades and provisional groundworks assumptions so every quote reflects the same structure.
  3. Explicit builder's finish or turnkey scope sheet. A one-page tick sheet stating exactly who supplies kitchen units, tiles, flooring, sanitaryware, radiators and external patio paving.
  4. Realistic Prime Cost (PC) allowances. Fix clear euro allowances for items not yet chosen in showrooms (for example €14,000 kitchen, €45/m² floor tiles) so quotes compare apples with apples.

Price my extension

Four quick taps and our builder m² guide shows before we ask for a phone number. One local builder rings you, not five.

A single-storey rear extension, 25 to 40 m², full turnkey (drawings ready): €83,000 to €118,000, incl. 13.5% VAT.

Step 1 of 5

What kind of extension?

Pick the closest layout. The builder checks tie-ins and structure on site.

How the m² build guide is worked out

The range reflects going Irish extension builder tender rates incl. 13.5% VAT for that layout, floor area and finish stage. Builder's finish covers substructure, strip footings, walls, RSJ steelwork, roof, windows, external render, drylining, screed and first-fix plumbing and electrics. Full turnkey adds kitchen units, sanitaryware, tiling, flooring and decorating allowances. Dublin, Wicklow, Kildare and Meath carry an 8% regional adjustment for site access and labour. Piled foundations on peat, heavy box-frame steel, drain diversions and architect or engineer fees are confirmed separately after reviewing drawings or inspecting the site.

Stage payments, contracts and 13.5% VAT rules

Written contract form

Standard Irish practice
RIAI Short Form / Homeowner Agreement
Why it protects you
Defines start date, completion date, insurance, variations and dispute steps plainly.

Deposit & stage payments

Standard Irish practice
Small booking deposit + 5 to 7 arrears draws
Why it protects you
Never pay far ahead of physical work completed and inspected on site.

Defects retention

Standard Irish practice
2.5% to 5% held 3 to 6 months
Why it protects you
Ensures minor plaster cracks, sticky doors or snagging leaks are fixed promptly.

VAT & insurance check

Standard Irish practice
13.5% VAT incl. + Public Liability & CAR
Why it protects you
Verify active Contractor's All Risks insurance covering the existing house before excavation.

VAT note: Construction contracts for residential house extensions carry the reduced 13.5% VAT rate across labour and permanently fixed building materials. Loose freestanding kitchen appliances and separate supply-only retail purchases are charged at 23% VAT.

Full ten-point builder quote checklist

  • Clear builder's finish vs turnkey boundary. State in writing whether kitchen units, sanitaryware, tiling, flooring and painting sit inside or outside the contract sum.
  • Foundation assumption written down. Confirm the quote assumes standard strip footings to 900 mm clay, with a pre-agreed m³ rate if soft peat, rock or a raft is found on excavation.
  • Steelwork and structural engineer sign-off. List exact RSJ section sizes, concrete padstones, crane or genie-lift hire, temporary propping and certified steel certificates.
  • Drainage diversion and manhole relocations. Price moving existing foul gullies, inspection chambers and rainwater soakaways before breaking concrete.
  • Part L insulation and airtightness build-up. Specify cavity or external insulation thickness, roof PIR depth, thermal breaks at steel lintels and window U-values.
  • Glazing schedule and PC sums. Record door widths, glass U-values, roof lantern sizing and realistic Prime Cost allowances so extras do not spiral midway through.
  • Existing house tie-in and making good. Include roof valley flashing, knocking through the rear wall, replastering the adjoining room and upgrading the main consumer unit if needed.
  • Site access, skips and waste disposal. Confirm digger access width, road skip permits, wheelbarrowing labour on terraced homes and disposal dockets.
  • Stage payment schedule tied to milestones. Link draws to completed physical stages (footings, wall plate, roofed/glazed, plastered, snag handover) with a 2.5% to 5% defects retention.
  • 13.5% VAT and C2/RCT tax clearance. Confirm the total includes 13.5% construction VAT, full Contractor's All Risks and Public Liability insurance, and HomeBond or structural certs.

Common questions before you tender

How much deposit should I pay an extension builder upfront?

Typically 5% to 10% at contract signing or material ordering, followed by stage draws paid strictly as physical milestones (footings, wall plate, roofed, plastered, second fix) are completed.

What is a PC sum on an Irish builder quote?

A Prime Cost (PC) sum is a provisional euro allowance for supply items you pick later, such as tiles, bathroom ware or kitchen units. If your chosen item costs more or less than the PC sum, the final account adjusts up or down transparently.

Should I sign a written contract for an exempt 30 m² extension?

Yes. Even on planning-exempt builds, a plain written contract fixing scope, payment stages, VAT inclusion, insurance and variation rules prevents almost every common dispute.

How do I stop variation extras spiralling mid-build?

Agree in writing before start that any extra or variation must be priced and approved by email or text before the builder carries it out, rather than tallied up at final handover.

Every extension build page and technical guide

A finished rear extension living room with wide sliding glass doors opening onto a slate patio and green garden

See your m² build range before a builder rings

Pick the extension type, floor area and finish stage. When you want a written tender price, your outline goes to one local extension builder in your county.