TGD Part L thermal envelope and the B2 BER Major Renovation rule

Every new Irish house extension must meet TGD Part L elemental U-values (walls <= 0.18, roofs <= 0.16, floors <= 0.18, windows <= 1.4 W/m²K). If your works modify more than 25% of the existing house's external surface area, Part L triggers Major Renovation requiring cost-optimal upgrades toward a B2 BER.

Mandatory insulation U-values for every new Irish extension, plus when renovating alongside an extension triggers a whole-house B2 upgrade.

Free, no obligation. One local builder prices it, not five.

  • <= 0.18 W/m²Kmax new wall U-value (Part L)
  • <= 0.16 W/m²Kmax new roof U-value (Part L)
  • > 25%surface area Major Renovation trigger
  • B2 BERcost-optimal Major Renovation target
An open-plan insulated living and dining extension with dark sliding doors overlooking trees in damp weather

Mandatory Part L elemental fabric standards for new extensions

Whether your build is a 15 m² exempt sunroom or a 70 m² two-storey extension, Building Regulations Technical Guidance Document Part L applies in full. Irish builders routinely outperform the statutory minimums to stop draughts and keep heating bills low.

External walls

Part L maximum U-value
0.18 W/m²K
Typical Irish builder specification
150 mm pumped/full-fill cavity blockwork, or 100 mm cavity + insulated drylining / external insulation

Flat or pitched roof

Part L maximum U-value
0.16 W/m²K
Typical Irish builder specification
150 mm to 175 mm rigid PIR insulation above warm flat deck, or 300 mm+ mineral wool over ceiling

Ground floor slab

Part L maximum U-value
0.18 W/m²K
Typical Irish builder specification
120 mm to 150 mm rigid PIR floorboard beneath screed with continuous perimeter edge strip

Windows & patio doors

Part L maximum U-value
1.4 W/m²K
Typical Irish builder specification
Low-E double (1.2 W/m²K) or argon triple glazing (0.8–1.0 W/m²K) with airtight perimeter tapes

Price my extension

Four quick taps and our builder m² guide shows before we ask for a phone number. One local builder rings you, not five.

A sunroom or glazed garden extension, 25 to 40 m², full turnkey (drawings ready): €76,000 to €108,000, incl. 13.5% VAT.

Step 1 of 5

What kind of extension?

Pick the closest layout. The builder checks tie-ins and structure on site.

How the m² build guide is worked out

The range reflects going Irish extension builder tender rates incl. 13.5% VAT for that layout, floor area and finish stage. Builder's finish covers substructure, strip footings, walls, RSJ steelwork, roof, windows, external render, drylining, screed and first-fix plumbing and electrics. Full turnkey adds kitchen units, sanitaryware, tiling, flooring and decorating allowances. Dublin, Wicklow, Kildare and Meath carry an 8% regional adjustment for site access and labour. Piled foundations on peat, heavy box-frame steel, drain diversions and architect or engineer fees are confirmed separately after reviewing drawings or inspecting the site.

Understanding the >25% Major Renovation B2 BER trigger

Homeowners planning an extension alongside re-roofing, re-rendering or external wall upgrades need to watch the Part L Major Renovation threshold closely. The 25% test measures how much of the existing dwelling's thermal envelope surface area (external walls, roof, ground floor and windows combined) undergoes renovation.

  • Pure new extension footprint alone rarely crosses 25%. Adding a 30 m² single-storey rear extension onto an intact 3-bed semi normally modifies only the rear knock-through section (roughly 8% to 14% of existing surface area), so only the new build itself must meet Part L.
  • Bundling a whole-house re-render or roof strip often crosses 25%. Stripping and re-slating the existing roof plus fitting external wall insulation pushes affected surface area well past 25%, activating Major Renovation.
  • What Major Renovation requires. Bringing the existing dwelling up to cost-optimal performance (equivalent to a B2 BER or primary energy <= 125 kWh/m²/yr) where technically, functionally and economically feasible, often via attic insulation, cavity pump/EWI, heating controls or heat pump.
  • Check SEAI grants before touching existing walls. If you are upgrading the existing house's insulation or heating alongside the extension, apply for SEAI Home Energy Grants before works begin on the existing fabric (grants do not fund new extension floor area, only upgrades to pre-2011 existing dwellings).

Common questions before you tender

Does adding a 35 m² rear extension force me to upgrade my whole house to B2 BER?

Usually no, if you are only opening a knock-through section of the rear wall (typically under 15% of the existing house's envelope surface area). The Major Renovation trigger kicks in when >25% of the existing house's external walls, roof, floor or windows are renovated.

Can I claim SEAI grants towards building a house extension?

No. SEAI grants strictly fund energy upgrades to the existing pre-2011 dwelling (such as pumping existing cavity walls, wrapping existing walls, attic insulation or replacing the main house boiler with a heat pump), never new extension construction.

What airtightness and ventilation rules apply to new extensions?

Builders must tape window reveals, service penetrations and roof vapour barriers cleanly under Part L, and supply adequate background and extract ventilation under Part F (typically wall vents/trickle vents plus ducted kitchen and utility extract fans).

Do big sliding glass doors fail Part L?

Large glazed elevations can exceed the default glazing ratio; your builder or BER assessor offsets extra glazing heat loss by upgrading glass to 0.8–1.0 W/m²K triple glazing and increasing roof and floor PIR insulation thickness.

Every extension build page and technical guide

A finished rear extension living room with wide sliding glass doors opening onto a slate patio and green garden

See your m² build range before a builder rings

Pick the extension type, floor area and finish stage. When you want a written tender price, your outline goes to one local extension builder in your county.