Extension Builders in Ireland, Priced by the m²
Tell us the layout, floor area and finish stage. See what Irish builders charge per m² right now. Then one local builder rings you with a written price.
Free, no obligation. One local builder prices it, not five.
- €2,600 to €3,800/m²turnkey extension build rate, incl. VAT
- Up to 40 m²rear single-storey floor area, Class 1 exempt
- 25 m²private rear garden space that must remain
- 1,836,728occupied private Irish homes, Census 2022
Six extension builds, priced by the m²
Select a build type to see Irish shell-and-core and full turnkey rates.
Single-storey rear kitchen extension (25–40 m²)€68,000 to €148,000 turnkey
Two-storey side or rear extension (50–80 m²)€120,000 to €272,000 turnkey
Wrap-around L-shaped extension (35–60 m²)€98,000 to €228,000 turnkey
Front porch or garage-conversion extension (2–20 m²)€12,000 to €56,000 built
Sunroom & glazed garden extension (20–35 m²)€50,000 to €119,000 turnkey
Builder's finish (shell & core) vs full turnkey€1,850 to €3,800/m²Price my extension
Four quick taps and our builder m² guide shows before we ask for a phone number. One local builder rings you, not five.
A single-storey rear extension, 25 to 40 m², full turnkey (early planning): €83,000 to €118,000, incl. 13.5% VAT.
How the m² build guide is worked out
The range reflects going Irish extension builder tender rates incl. 13.5% VAT for that layout, floor area and finish stage. Builder's finish covers substructure, strip footings, walls, RSJ steelwork, roof, windows, external render, drylining, screed and first-fix plumbing and electrics. Full turnkey adds kitchen units, sanitaryware, tiling, flooring and decorating allowances. Dublin, Wicklow, Kildare and Meath carry an 8% regional adjustment for site access and labour. Piled foundations on peat, heavy box-frame steel, drain diversions and architect or engineer fees are confirmed separately after reviewing drawings or inspecting the site.
Three stages from outline to signed contract
- Check your m² budget firstTap the layout, rough floor area and shell or turnkey spec to view an Irish guide price before leaving a number.
- One local builder walks the houseYour outline reaches one builder covering your county to inspect rear access, drains, steel spans and ground conditions.
- Fixed stage tender in writingYou receive an itemised written build price split into milestone draws, with zero obligation to proceed.
A rough builder ballpark, or a priced stage tender
A rough ballpark
- Single lump figure given without checking soil, drains or RSJ spans
- Glazing, padstones or kitchen fit-out billed as unexpected extras
- Five contractors phoning from a shared directory blast
A priced stage tender
- Clear m² guide shown on screen before you enter a mobile number
- Foundations, steelwork and builder's finish boundary set out upfront
- One local extension builder quotes in writing after inspecting the house
Four questions before a builder rings
- Will I be hounded with calls?
- No. Your details pass to one local extension builder in your county, and nobody else. There is no directory list and no repeat calling.
- Can I get a builder's price before drawings are finished?
- Yes. Early budget visits help check access, drainage and rough steel spans so your architect designs to a figure you can build.
- What is the difference between shell-and-core and turnkey?
- Builder's finish (€1,850 to €2,550/m²) delivers the weathertight plastered shell with first-fix plumbing and electrics. Turnkey (€2,600 to €3,800/m²) adds kitchen, tiling, floors and painting.
- How long is my house a building site?
- Allow 14 to 18 weeks on site for a single-storey rear build, 16 to 22 weeks for a wrap-around, and 20 to 26 weeks for two storeys.

See your m² build range before a builder rings
Pick the extension type, floor area and finish stage. When you want a written tender price, your outline goes to one local extension builder in your county.
Shell-and-core versus full turnkey m² rates
How Irish builders split contract scope across structural work and interior fit-out.
Builder's finish (shell & core)
- Irish m² rate (incl. 13.5% VAT)
- €1,850 to €2,550/m²
- 30 m² rear kitchen build
- €56,000 to €76,500
- Included in contract
- Footings, blockwork, RSJ, roof, glazing, render, first fix, screed & plaster
- Who manages finish fit-out
- Homeowner hires kitchen, tiler & painter directly
Full turnkey build
- Irish m² rate (incl. 13.5% VAT)
- €2,600 to €3,800/m²
- 30 m² rear kitchen build
- €78,000 to €114,000
- Included in contract
- Everything in shell plus kitchen, sanitaryware, tiling, flooring & painting
- Who manages finish fit-out
- Main builder coordinates every subcontractor to handover
For full stage-by-stage line items, Prime Cost allowances and county pricing differences, read extension build rates per m² and builder's finish vs turnkey.
Where structural money goes on site
Ground conditions and rear-wall steelwork move a builder's tender faster than paint or tiles.
Every Irish extension starts in the trench. Glacial boulder clay takes strip footings cleanly, whereas midlands peat or estuarine silt requires a reinforced raft or piling. See foundations and groundworks and steel RSJs and structural sign-off.
Class 1 planning thresholds in plain terms
Schedule 2, Part 1, Class 1 of the Planning and Development Regulations 2001 (S.I. No. 600 of 2001) sets four hard numbers.
- 40 m² aggregate rear floor cap. All rear extensions combined, including any earlier extension built since 1964 or original permission, cannot exceed 40 m² without planning.
- 25 m² private rear garden kept. At least 25 m² of clear, private open space must stay behind the house after the build.
- 12 m² / 20 m² first-floor ceiling. Upper-storey rear exemptions stop at 12 m² on terraced or semi-detached homes (held 2 m off any party boundary) and 20 m² on detached houses.
- 1 m and 11 m window setbacks. New ground-floor windows stay 1 m from a facing boundary; upper-floor windows stay 11 m back. Front porches cap at 2 m² under Class 7.
Exempt builds still require full Part L thermal compliance. Read Class 1 planning exemptions and Part L thermal and B2 BER rules.
Extension builders across all 26 counties
Ground geology, narrow city access and regional labour rates vary county by county.
- Dublin buildersTerrace access, skip permits & +8% rates
- Cork buildersCity & county clay, coastal render specs
- Galway buildersKarst rock breaking & exposed cavities
- Limerick buildersEstuarine raft footings & Shannon rates
- Kildare & MeathEstate semi-detached rear & wrap builds
- All 26 countiesRegional coverage & local builder matching
Five clauses to check before signing a builder contract
Clear tender packs prevent disputes midway through the build.
- Clear builder's finish vs turnkey boundary. State in writing whether kitchen units, sanitaryware, tiling, flooring and painting sit inside or outside the contract sum.
- Foundation assumption written down. Confirm the quote assumes standard strip footings to 900 mm clay, with a pre-agreed m³ rate if soft peat, rock or a raft is found on excavation.
- Steelwork and structural engineer sign-off. List exact RSJ section sizes, concrete padstones, crane or genie-lift hire, temporary propping and certified steel certificates.
- Drainage diversion and manhole relocations. Price moving existing foul gullies, inspection chambers and rainwater soakaways before breaking concrete.
- Part L insulation and airtightness build-up. Specify cavity or external insulation thickness, roof PIR depth, thermal breaks at steel lintels and window U-values.
See all ten tender checks, stage-payment rules and RIAI contract notes on tendering and pricing a builder.
Common questions before you tender
How much do extension builders charge per m² in Ireland?
Extension builders in Ireland currently price full turnkey extensions at €2,600 to €3,800/m² incl. 13.5% VAT, and builder's finish (shell and core) at €1,850 to €2,550/m². A 30 m² single-storey rear kitchen extension typically lands between €78,000 and €114,000 turnkey, with Dublin and commuter counties running roughly 8% above regional rates.
What does builder's finish include compared with full turnkey?
Builder's finish (€1,850 to €2,550/m²) covers foundations, masonry or timber frame, steel RSJs, roof, windows, external render, drylining, screed and first-fix electrics and plumbing. Full turnkey (€2,600 to €3,800/m²) adds kitchen cabinetry, sanitaryware, tiling, flooring and painting.
How big can a rear extension be without planning permission in Ireland?
Under Class 1 of the Planning and Development Regulations 2001 (S.I. No. 600 of 2001), a rear extension is normally exempt up to 40 m² aggregate floor area (including any previous extensions) provided at least 25 m² of private rear open space remains. First-floor rear exemptions cap at 12 m² for terraced or semi-detached homes (with a 2 m party boundary setback) and 20 m² for detached houses, with upper windows kept 11 m from any facing boundary.
When does a house extension trigger the Part L Major Renovation B2 BER rule?
Under TGD Part L, altering more than 25% of the existing house's external thermal envelope surface area triggers Major Renovation, requiring cost-optimal energy upgrades across the existing dwelling toward a B2 BER where feasible.
What VAT rate applies to residential extension builders in Ireland?
Construction contracts for residential house extensions carry the reduced 13.5% VAT rate across labour and permanently fixed building materials. Loose freestanding kitchen appliances and separate supply-only retail purchases are charged at 23% VAT.
Strip footings or raft foundation: how do builders decide?
Builders excavate trial holes to confirm bearing subsoil. Stiff glacial boulder clay accepts trench strip footings (€9,000 to €16,000 for 30 m²). Soft clay, made ground or peat requires an engineer-designed reinforced concrete raft (€14,500 to €24,000) or piles.
How long does an extension build take on site?
Most Irish single-storey rear extensions spend 14 to 18 weeks on site from excavation to handover. Wrap-around builds take 16 to 22 weeks, and two-storey extensions run 20 to 26 weeks, excluding pre-build drawings or council planning.
Who rings me after I complete the 4-tap price planner?
Your extension outline and contact details go to one local extension builder in your county, and nobody else. They review your drawings or inspect the site and issue a written tender figure.