Extension builder questions, answered plainly
Irish m² rates, shell-and-core contracts, footings, RSJs, Class 1 exemptions, Part L B2 triggers and timelines.
Free, no obligation. One local builder prices it, not five.
- €2,600–€3,800/m²turnkey build rate incl. VAT
- €1,850–€2,550/m²builder's finish (shell & core)
- 40 m² / 25 m²Class 1 rear & garden thresholds
- 14–26 wkstypical site build schedule
Price my extension
Four quick taps and our builder m² guide shows before we ask for a phone number. One local builder rings you, not five.
A single-storey rear extension, 25 to 40 m², full turnkey (early planning): €83,000 to €118,000, incl. 13.5% VAT.
How the m² build guide is worked out
The range reflects going Irish extension builder tender rates incl. 13.5% VAT for that layout, floor area and finish stage. Builder's finish covers substructure, strip footings, walls, RSJ steelwork, roof, windows, external render, drylining, screed and first-fix plumbing and electrics. Full turnkey adds kitchen units, sanitaryware, tiling, flooring and decorating allowances. Dublin, Wicklow, Kildare and Meath carry an 8% regional adjustment for site access and labour. Piled foundations on peat, heavy box-frame steel, drain diversions and architect or engineer fees are confirmed separately after reviewing drawings or inspecting the site.
Every question answered
How much do extension builders charge per m² in Ireland?
Extension builders in Ireland currently price full turnkey extensions at €2,600 to €3,800/m² incl. 13.5% VAT, and builder's finish (shell and core) at €1,850 to €2,550/m². A 30 m² single-storey rear kitchen extension typically lands between €78,000 and €114,000 turnkey, with Dublin and commuter counties running roughly 8% above regional rates.
What is included in builder's finish (shell and core)?
Builder's finish (€1,850 to €2,550/m²) includes site clearance, foundations, rising walls, radon barrier, superstructure masonry or timber frame, steel RSJs, roof, windows and external doors, external render, drylining, internal plastering, floor screed and first-fix plumbing and electrical cabling.
How much does a full turnkey finish add per m²?
Full turnkey adds roughly €750 to €1,250/m² on top of builder's finish, covering second-fix carpentry, kitchen supply and installation, utility joinery, bathroom sanitaryware, tiling, timber or tiled flooring, internal painting and final electrical and plumbing commissioning.
How big can a rear extension be without planning permission?
Under Class 1 of the Planning and Development Regulations 2001 (S.I. No. 600 of 2001), a rear extension is normally exempt up to 40 m² aggregate floor area (including any previous extensions) provided at least 25 m² of private rear open space remains. First-floor rear exemptions cap at 12 m² for terraced or semi-detached homes (with a 2 m party boundary setback) and 20 m² for detached houses, with upper windows kept 11 m from any facing boundary.
What is the Class 1 first-floor limit on a semi-detached house?
A rear upper-storey extension on a semi-detached or terraced house is capped at 12 m² under Class 1, must sit at least 2 m from any party boundary, and any upper window must stay at least 11 m from the facing boundary.
When does an extension trigger the Part L B2 BER Major Renovation rule?
When your building works modify more than 25% of the existing dwelling's total external surface area (walls, roof, floor and openings combined), TGD Part L requires cost-optimal thermal upgrades across the existing house toward a B2 BER where technically and economically feasible.
Do I need a structural engineer for an RSJ knock-through?
Yes. Removing a load-bearing rear wall requires structural steel sizing, concrete padstone specifications, bearing checks and an on-site sign-off certificate from a chartered structural engineer, both for safety and future house sale conveyancing.
When do Irish builders switch from strip foundations to a raft?
Trial holes showing soft alluvial clay, deep fill or peat rather than firm boulder clay at 900 mm to 1,200 mm require an engineer-designed reinforced concrete raft slab or piled ground beams.
Do I need a BCAR Commencement Notice for an extension?
Extensions of 40 m² or less do not require a BCMS Commencement Notice. Extensions over 40 m² must lodge a Commencement Notice 14 to 28 days before site start, choosing either an Assigned Certifier or a homeowner Opt-Out Declaration.
What VAT rate applies to house extension builders?
Construction contracts for residential house extensions carry the reduced 13.5% VAT rate across labour and permanently fixed building materials. Loose freestanding kitchen appliances and separate supply-only retail purchases are charged at 23% VAT.
How long does an extension take from start to finish?
Most Irish single-storey rear extensions spend 14 to 18 weeks on site from excavation to handover. Wrap-around builds take 16 to 22 weeks, and two-storey extensions run 20 to 26 weeks, excluding pre-build drawings or council planning.
Should I move out while an extension is being built?
Many families stay in the house during a straightforward rear single-storey build by erecting a temporary dust partition until knock-through week. For wrap-around builds, major boiler/wiring changes or two-storey tie-ins, moving out for the 6 to 10 dustiest weeks keeps the schedule faster and cleaner.
Who contacts me after I submit the 4-tap form?
Your extension outline and contact details go to one local extension builder in your county, and nobody else. They review your drawings or inspect the site and issue a written tender figure.
Every extension build page and technical guide
Extension build types
Construction stages & rules

See your m² build range before a builder rings
Pick the extension type, floor area and finish stage. When you want a written tender price, your outline goes to one local extension builder in your county.